Donnerstag, 27. Juni 2013
Apart - Hotel
Strandhäuser
Entwurfs-, Genehmigungs- und Ausführungplanung,
Künstlerische Oberleitung, Baubegleitung,
Anleitung der Bauleitung
in Hörnum auf Sylt.
Fertigstellung Sommer 2013
4 Reihenhäuser über 3 Ebenen,
100m entfernt vom Weststrand.
Ansicht von Osten kommend
Holzleistenfassade, Staffelgeschoß
mit Titanzinkverkleidung
Ansicht von Westen.
Südterrassen im EG und DG
Ansicht von Norden.
Zugänge zu den 4 Reihenhäusern mit
Abfallhäuschen und Stellplatz
Terrassenbeläge aus Recyle - Kork Paneelen
Hauseingänge im Souterrain
Dienstag, 29. April 2008
- Dorint Novotel, Paris - Roissy
Mittwoch, 23. April 2008
- Time Periods
My Time as Student of Interiordesign in Düsseldorf
1995 - 2002
My Time as autonomous Interiordesigner and Partner in the office
Prof. Görge + Partner
2002 - 2004
My time at Tombusch&Brumann Interieurdesign in Ascheberg
In the time period between October 2002 and October 2004 I was employed
at the company Tombusch&Brumann Interieurdesign in Ascheberg, near Münster. This is a company for Property Settings, having, beside several Production places, their own Planning- Purchase- and Assembly - Department. My position was the Head of the Interior Design department.
During this period I could realize, with a team of 12 Interior Designers, Hotel projects of all stars categories. Refurbishments as well as New built Hotels in Germany, Swiss and France.
My responsibility was situated in the coordination of the teams in the different projects, leading the designing and construction planning’s.
Representing and presenting the company and the work at the clients.
During this time period I was applicable involved in following projects:
Refurbishment
Mercure Hotel, Dresden in 2002
Design of Rooms, Bathrooms and all public areas
(not accomplished)
New built
Dorint Novotel, München Riem in 2002/2003
Design the guestrooms, corridoors aand all public areas
(Opened, March 2004)
New built
Dorint Novotel, Paris Roissy in 2003/2004
Design of all public areas
(Opened, April 2004)
Refurbishment
Holiday Inn Hotel, Leipzig in 2003
Redesign of the public areas and guestrooms
(Realized, June 2004)
Refurbishment
Nassauer Hof, Wiesbaden in 2003
Design of a luxury representative Suite
incl. Living room, Pantry kitchen, Dining room Bedroom, Bath and Sauna
(Not accomplished)
Refurbishment
Nassauer Hof, Wiesbaden in 2004
Design of a Gourmet - Bistro
(Opened, March 2004)
Refurbishment
Dorint Ressort, Kärnten, Austria in 2003
Redesign and furnishing of 2 Skiing Holiday Apartments
Textiles and custom made Cedar tree furniture
(Executed, 2003)
Refurbishment
Holiday Inn Hotel, Hamburg in 2004
Designof the Entrance Hall, Lobbies, Corridoors, Wellness area and Boardinghouse
(Not accomplished yet)
New built
Dorint Novotel KPM , Berlin in 2004
Design of all public areas
(Opened Mai 2005)
Conversion
Rohlmanns Hof, Ascheberg in 2004
New Company Building of Tombusch & Brumann in Ascheberg
Design of the Conversion of an old, land marked house
to a Companies Office Building
2004 - 2007
My time at PCG Planungs- und Consulting GmbH, in Hannover
In the time period between November 2004 and Mai 2007, I was employed in an office for Property Settings, Architecture and Interior Design, specialized in the Russian speaking marked.
PCG – Planning an Consulting GmbH, in Hannover.
My position was the Head of the Interior Design department.
During this period I could realize, with a team of 6 cooperators, Interior Designers, Engineers and drawing assistants, Brand Hotel projects in Kazakhstan, in the Ukraine and in Russia.
My responsibility was situated in the designing and the coordination of the team; leading the designing and construction planning’s.
Representing and presenting the company and the work in meetings with the clients.
During this time period I was applicable involved in following projects:
New built
Holiday Inn Hotel, Almaty, Kazakhstan in 2004/2005
Design of the Guestrooms, Corridoors, Suites and Presidential Suites, and all public areas
(Not yet opened, because of the World Bank crisis)
New built
Hotel Nursaya Hotel, Astana, Kazakhstan 2004/2005
Design of the guestrooms, Corridoors and all public areas
(Not yet opened)
New built
Hotel Sherrizone, Moskau, Russia in 2005
Design of the guestrooms, Corridors and all public areas
(Not yet opened)
New built
City Hotel Vologda, Vologda, Russia in 2006
Design of the guestrooms, Corridors and all public areas
(Not accomplished)
New built
Hotel Jachroma, near Moskau, Russia in 2006
Design of the guestrooms, Corridors and all public areas
(Not yet opened)
Refurbishment
Hotel Murom, Murom, Russia in 2006/2007
Design and redesign of the guestrooms, Corridors and all public areas
Conversion
Sophienterrassen 5*****Hotel, Hamburg in 2006/2007
Designwork to turn an old landmarked Administration Building into a 5 Stars Hotel.
2007 - 2008
My time at ThyssenKrupp Marinesystems, Blohm+Voss GmbH in Hamburg and HDW in Kiel
In the time period between Mai 2007 and January 2008 I was employed
at Blohm+Voss GmbH / TKMS, Hamburg
My position was Head of the Interior department. My department was divided
in two Groups, working in Kiel at HDW, and in Hamburg at Blohm+Voss.
My responsibility was situated in the disciplinary and technical / professional directory of the internal and external employed Engineers. The operational handling of the topics was carried out by two Group Leaders, one in Kiel and one in Hamburg. Beside the inhouse competence, I was obliged to maintain our Customers, according to my departments business, as well as to control our subcontractors in order to fulfil their obligations.
Alteration
As I remember and still do realize today, it has never been different;
I have always been, and still am exclusively interested in developing and improving Quality. No matter if it is in Business, private life or in sports.
Dienstag, 22. April 2008
- Residence
To work out the Final Design of an investor’s competition, our office was again asked, to take over an interesting order.
The problematic was to develop one hundred high standard Apartments into an already existing area and Landscape plan. This Apartment’s should cover all aspects of modern living from today and in future, as well as all aspects of living in higher ages.
My position was to control our Team of 2 Architects and 3 drawing assistents in our office. I was in charge to develop different Ground plan layouts for the differiung apartment typs, as well as architectural details under consideration of acoustic, fire- and thermotechnical requirements.
After the period of developing the preliminary Designs to the Final Designs, we have been working the project out to be ready to get release by the town authority.
Montag, 21. April 2008
- Headquarter Building
My part was beside the development of the Architectural relevant details,
The Interior Design as well as the detailed design in scales 1:1 and the construction planning’s of the entire Interior, to prepare the tender documents and to control our office team.
Interior customized separtation walls, fixed - and loose furniture in in a symbiosis with the external appearance of the Arcitecture.
Interior Details